Town seeks bids for 145 Canyon Road Restabilization and Repaving Project

Posted on June 19, 2023


145 Canyon Road Re-stabilization and Repaving Project

The Project is for the installation of a new soldier pile and tie-back retaining wall alongside the creek and below the road, and repaving a section of the roadway.

Addendums

Bid submission location + deadline

  • NEW BID SUBMISSION DEADLINE: July 25, 2023 at 2:00 p.m.
    (Original bid submission deadline: July 18, 2023, at 2:00 p.m.,)
  • Town Hall office, located at 142 Bolinas Rd, Fairfax, California, 94930

The bids will be publicly opened and read aloud.

Bid results

Posted: July 26, 2023

Contractor Bid amount
RWR Construction, Inc $406,588
Farallon Company $408,875
Westward Construction $424,398
Maggiora & Ghilotti $579,700
CF Contracting $680,680

Documents

Time for Final Completion

The Project must be fully completed within 90 calendar days from the start date set forth in the Notice to Proceed.

Estimated Cost

The estimated construction cost is $300,000.

License

This Project requires a valid California contractor’s license for the following classification(s): Class A – General Engineering.

DIR Registration

Town may not accept a Bid Proposal from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations (“DIR”) to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions.

Contract Documents

The plans, specifications, bid forms and contract documents for the Project, and any addenda thereto (“Contract Documents”) may be downloaded from City’s website . Printed copies of the Contract Documents are not available.

Prevailing Wage Requirements

Pursuant to California Labor Code § 1720 et seq., this Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes.

Rates

The prevailing rates are on file with the Town and are available online through the Department of Industrial Relations. Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half.

Compliance

The Contract will be subject to compliance monitoring and enforcement by the DIR, under Labor Code § 1771.4

Instructions to Bidders

All bidders should carefully review the Instructions to Bidders for more detailed information before submitting a Bid Proposal. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, as defined therein, including this Notice Inviting Bids.

Bidders’ Conference (mandatory)

A bidders’ conference will be held on July 25, 2023 at 2:00 p.m., at the the job site at 145 Canyon Road, Fairfax, CA 94930 to acquaint perspective bidders with the Contract Documents and the Worksite. The bidders’ conference is mandatory.

Questions

Bid questions must be in writing and can be emailed to Loren Umbertis at Lumbertis@townoffairfax.org.

Close window